Moroccan electric and water utility ONEE has signed a power purchase agreement (PPA) with a consortium formed by Italy’s Enel Green Power and Moroccan energy company Nareva Holding related to the 270-MW Jbel Lahdid wind farm that the duo will build in the North African kingdom.
read more... 06/01/2021
Areva-Siemens has told TVO the final verification of the mechanical, electrical and the instrumentation and control (I&C) systems has to be done carefully and to a high standard.
read more... 11/11/2019
France’s Areva and Germany’s Siemens will make a payment of 450 million euros (£400 million) for cost overruns and postponements at a nuclear reactor which they are constructing for Teollisuuden Voima (TVO) in Finland, settling a long-running dispute.
read more... 12/03/2018
French nuclear firm New AREVA and Korea Hydro & Nuclear Power (KHNP) inked an accord aiming to reinforce their collaboration in the dismantling and cleanup of nuclear reactors.
read more... 06/12/2017
France and Switzerland have been affected by quality assessment issues. EDF Group stated that Areva had found out that quality control deviations occur on specific rods, which meant the provider was incapable to demonstrate that quality control to prove that the leak tightness of those rods had been properly carried out.
read more... 22/11/2017