PGNiG snaps more US LNG with Cheniere supply deal

08/11/2018 10:06 LNG

news

Polish Oil and Gas Company (PGNiG) has signed a supply deal with Houston-based Cheniere for the delivery of more US LNG to the President Lech Kaczyński LNG Terminal in Świnoujście.


LNG cargoes will be supplied on a delivered ex-ship basis over a 24-year period starting in 2019, PGNiG said in its statement.


In 2019-2022 the volume of supplies will total approximately 0.52 million tonnes of LNG, or approx. 0.7 bcm of natural gas after regasification, while in the period of 2023-2042, the total import volume will reach 29 million tonnes of LNG, which equals approx. 39 bcm of natural gas following regasification.


It means that starting from 2023 every year PGNiG will purchase about 1.45 million tonnes of LNG, which equals approx. 1.95 bcm of natural gas after regasification, the company said.


LNG cargoes from Cheniere heading for Poland will depart from liquefaction facilities in Sabine Pass, Louisiana and Corpus Christi, Texas.


The deal extends PGNiG’s US LNG supply portfolio and follows 20-year agreements with Venture Global for the delivery of approximately 1 mtpa from its Calcasieu Pass and Plaquemines projects to be located on the Gulf of Mexico and the Mississippi River, respectively.


Source: lngworldnews.com
 

Daily (18.03.2019): European spot prices tumbled by over 30% on Friday due to strong renewables generation

18/03/2019 10:30:00

Oil prices edged lower on Friday as rising crude U.S. weekly production and worries about global economy put pressure on the market. Brent crude slipped by 0.1% to $67.16 a barrel, while WTI futures traded 0.2% lower at $58.52 a barrel.

<READ MORE

Gazprom starts on Serbian CCGT

18/03/2019 09:06:00

Gazprom has started the construction of a 200 MW combined cycle gas turbine (CCGT) power plant in Serbia.

READ MORE

Bulgaria eyes to receive additional gas from Azerbaijan

18/03/2019 09:00:00

Bulgaria is interested in additional gas supplies from Azerbaijan, Bulgarian Prime Minister Boyko Borisov told reporters, Azernews informed. Borisov noted that during the meeting with President of Azerbaijan Ilham Aliyev, the issue of the construction of an interconnector for connecting to the TAP for the delivery of 1 billion m3 of gas to Bulgaria was discussed.

READ MORE