Vestas obtained a 45-megawatt wind farm order from Jordan

30/03/2018 15:51 Wind

news

Danish Vestas got a 45-megawatt wind site order in Jordan.

Vestas declared that it obtained an engineering, procurement and construction (EPC) order for the Al Shobak wind facility to be situated in the Ma'an governorate within the district of Shobak in southern Jordan.


Shobak Wind Energy, a new client and majority-owned subsidiary of Alcazar Energy, a Dubai-based independent developer and power producing firm orientated on renewable energy generation in the Middle East, Turkey and Africa, submit the order.

 

The project is Vestas' third EPC contract for utility-scale wind farms in Jordan, after Al Tafila with 114 megawatts and Fujeij with 89 megawatts.


Turbine delivery is scheduled for the second quarter of 2019, while commissioning is planned by the end of 2019.

CO2 may plumb fresh lows this month on virus impact

02/04/2020 09:45:00

The coronavirus pandemic is likely to maintain pressure on carbon prices in April, potentially sending them to fresh two-year lows as the world locks down communities to reverse the pace of infections.

<READ MORE

Arctic gas finds new way from Yamal to China

02/04/2020 09:39:00

Gazprom leader Aleksey Miller in last Friday’s meeting with President Vladimir Putin confirmed that the building of new east-bound natural gas infrastructure now is high on the company’s agenda.

READ MORE

Daily (01.04.2020): WTI crude rebounded by about 2% on Tuesday, but outlook remains gloomy

01/04/2020 10:58:00

Oil futures evolved differently on Tuesday, with Brent crude edging lower at $22.74 a barrel, but showed some signs of improvement in early trading after U.S. President Donald Trump and its Russian counterpart Vladimir Putin agreed to talks on stabilizing energy markets. Meanwhile, U.S. WTI crude rose by 1.9% to settle at 20.48 a barrel.

READ MORE